Quantcast
Channel: Facility & Tenant – TES Engineering
Browsing all 5 articles
Browse latest View live

Gig Harbor / Merrill Gardens Retirement Home

This multi-story design consisted of a dual-purpose assisted living and nursing home facility. Unique building design features created opportunities to overcome challenges related to equipment locations.

View Article


Heather Hill Care Communities

A 97-room assisted living facility located in Cleveland, this project’s design included a complete water source heat pump loop to each room with a central cooling tower and boiling system.

View Article


Unnecessary Expenses

TES’ experience with prototypes and knowledge of large-quantity equipment costing helped Hyatt Hotels achieve significant cost savings without sacrificing comfort or safety in the MEP design of three...

View Article

James Bond (Almost)

A large medical complex in town was growing quickly, and like many hospitals, the facility expanded around its central plant, leaving no traditional access for easily removing or installing mechanical...

View Article

A Cannery, Transformed

The Cannery, a former canning plant, was an adaptive reuse project with six floors that included retail space and 153 loft apartments. This renovation totaled nearly 250,000 square feet. The TES team...

View Article

Browsing all 5 articles
Browse latest View live